Critical Path Resolutions LLC

USDOT activeAuthority activeCarrier & Broker · Interstate
  • USDOT5275929
  • MC60666545
  • MC93368121
  • MC77024973
  • LocationWaskom, TX
  • Phone(903) 812-0116
  • Fleet5 power units · 16 drivers

Critical Path Resolutions LLC (USDOT 5275929, MC-60666545) is an interstate motor carrier based in Waskom, Texas with 5 power units and 16 drivers reported to FMCSA. Its USDOT number and operating authority are active.

Verification snapshot · FMCSA data as of Nov 10, 2026

Got a call or email from someone using this company’s name? Check the phone number or email against FMCSA records.

Operating authority

Status from the FMCSA Company Census File, November 10, 2026

DocketAuthority typeStatus
MC-60666545Motor Carrier of Property (except Household Goods)Active
MC-93368121Broker of Household GoodsActive
MC-77024973Broker of Property (except Household Goods)Active

Insurance

FMCSA licensing system (Motus), November 11, 2026

  • Liability (BIPD) required$300,000
  • Liability (BIPD) on file$0
  • Cargo insurance required / on fileNo / No
  • Bond required / on fileNo / No

Filings on file

No current insurance filing was found in FMCSA licensing records for this USDOT number.

Process agent (BOC-3)

No BOC-3 filing was found in FMCSA licensing records.

Inspections and crashes

Last 24 months · FMCSA Vehicle Inspection File and Crash File

No roadside inspections or reportable crashes are on file for this USDOT number in the last 24 months.

FMCSA safety rating: Not rated

Inspection and crash counts come from FMCSA records and are shown as reported. They are not a safety rating. A crash record does not mean the carrier was at fault. FMCSA has not rated a carrier unless a safety rating is listed. For FMCSA’s own data and its explanation, see the FMCSA SAFER Company Snapshot.

Out-of-service rates are calculated by CheckTrucking from inspection records (driver: levels I, II, III, VI; vehicle: levels I, II, V, VI). They are not FMCSA scores.

Authority history

FMCSA licensing records (Motus and legacy L&I) · migration-only status adjustments are not shown

  1. Initial status — Broker of Household Goods; Broker of Property (except Household Goods); Motor Carrier of Property (except Household Goods)

Fleet and operations

From the company’s own registration (Form MCS-150)

Power units
5
Trucks
0
Trailers owned
3
Drivers
16
CDL drivers
1
Interstate drivers
8
Intrastate drivers
8
Classification
Authorized for hire
Hazardous materials
No
USDOT registered
June 2, 2026
Address
2642 Candyman Rd, Waskom, TX 75692
Phone (registered with FMCSA)
(903) 812-0116

Cargo carried

  • General freight
  • Household goods
  • Metal: sheets, coils, rolls
  • Logs, poles, beams, lumber

Key facts

  • USDOT number 5275929 was registered on June 2, 2026.

Other carriers in Waskom, TX

Is this information wrong?

This page shows public FMCSA records. Companies update their USDOT registration with FMCSA (Form MCS-150). You can also ask us to correct or remove this page.